The ship has been docked at the Kinder Morgan Fairless Hills Terminal near Philadelphia. The loading of bulk cargo was delayed by heavy rain. Once it finishes loading it will depart and head straight here to Port Everglades. The ETA has moved out from June 18 to June 20 and the loading dates are now June 20-22. That results in an ETA in La Paz of July 6.
I figure it will take the ship three days to get from Fairless Hills to Port Everglades. That means the ship needs to leave by tomorrow. As of tonight, it's still at wharf.
This has been one of the most frustrating experiences I can remember.
I'm hanging in there, but it's demoralizing, lonely and depressing at times. It's been raining almost constantly here, which doesn't help.